How much did it cost to build the USS Missouri?

How much did it cost to build the USS Missouri?

She was also the fourth US Navy warship to be named after the U.S. state of Missouri. The battleship was laid down at New York Navy Yard on January 6, 1941 and her construction cost was estimated at 92 million dollars. The construction of the Missouri, similarly to the other Iowa class battleships, went very smoothly.

How much does it cost to maintain a battleship?

The annual cost of operating one steam-powered battleship is $35 million, more than twice the $15 million needed to operate a cruiser and three times the $11 million cost of running a destroyer for a year, according to Navy figures.

READ ALSO:   How many days off a week do chefs get?

How much did Pearl Harbor repair cost?

The repairs cost more than $2.1 million. The Japanese surprise attack at Pearl Harbor on Dec. 7, 1941, killed 1,177 crew members on the Arizona. More than 330 survived.

How much does it cost to build a nuclear power plant?

The OECD Nuclear Energy Agency’s (NEA’s) calculation of the overnight cost for a nuclear power plant built in the OECD rose from about $1900/kWe at the end of the 1990s to $3850/kWe in 2009. In the 2015 report Projected Costs of Generating Electricity, the overnight costs ranged from $2021/kWe in South Korea to $6215/kWe in Hungary.

How much does it cost to build a nuclear-powered submarine?

How Much Does It Cost to Build a Nuclear-Powered Submarine. Ballpark Estimate: $2 billon to $2.5 billion. Silently cruising the black depths of the global oceans, the U.S. nuclear attack submarines are a constant reminder of the precarious world we live in as they continue to maintain their vigilant surveillance.

READ ALSO:   Is Windows server a Web server?

Are decommissioning costs included in the cost of nuclear power?

Waste disposal and decommissioning costs are usually fully included in the operating costs. If the social, health and environmental costs of fossil fuels are also taken into account, the competitiveness of nuclear power is improved.

Are the economics of nuclear power fully taken into account?

In assessing the economics of nuclear power, decommissioning and waste disposal costs are fully taken into account. Nuclear power plant construction is typical of large infrastructure projects around the world, whose costs and delivery challenges tend to be under-estimated.