Can an electrical engineer work in automation?
Automation is covering not only instrumentation but also electrical instruments like a servo, stepper motor, VMC, CNC, AC DC drives control with PLC and SCADA. Therefore, engineers have the best career opportunities in the sphere of industrial automation as every technologies and process are adopting automation.
Is PLC important for electrical engineering?
Yes it is important in Electrical Engineering.
What is a PLC electrical engineer?
A PROGRAMMABLE LOGIC CONTROLLER (PLC) is an industrial computer control system that continuously monitors the state of input devices and makes decisions based upon a custom program to control the state of output devices. That is, you can mix and match the types of Input and Output devices to best suit your application.
What is the difference between PLC and SCADA?
PLC is a device used for making the process or the machine automatic and SCADA is used to supervise those projects or machines with a simple griphical user interface. To if you watch in combined prospective PLC and SCADA are the devices used for the process of automation.
What does a senior SCADA engineer do?
Served in lead technical role on modernization of Company’s SCADA/Control Systems. Service and repair hydraulic, pneumatic, hydro-pneumatic and electro-pneumatic instrument/control systems. document, implement and maintain essential SCADA and control systems and components for electric power and distribution networks. 4. Data Acquisition
What are the best OEM companies for industrial automation?
Big companies like SIEMENS,GE, ABB, Fanuc, Honeywell , Mitsubishi are the best OEM in industrial automation and they are providing their service and product world wide. Artificial intelligence , IOT, Machine Learning also now a days integrated with PLC SCADA.
What is the scope of SCADA system requirements guide?
The scope of the criteria cover the needs of SCADA systems including communications with other systems, instrumentation, and networks. The guide has attributes tailored for water and wastewater organizations, and allows those involved in a SCADA selection process to make quicker and improved decisions.