What does IFC drawings mean?

What does IFC drawings mean?

Issued for Construction
IFC and Show Drawings in Construction Projects. Shop drawing is a drawing that is produced by the contractor, subcontractor, manufacturer, fabricator or the supplier whereas IFC (Issued for Construction) is a type of drawing issued to the contractor by the client or his/her representative.

What is MEP drawing?

MEP drawings, in the construction industry, is a discipline of civil engineering that focuses on building safety, working, and energy-efficient structures. MEP refers to the mechanical, electrical, and plumbing systems which mainly serve as the backbone to the construction works.

What is architectural and structural working drawing?

A structural drawing, a type of engineering drawing, is a plan or set of plans and details for how a building or other structure will be built. General Notes are part of structural drawings and they cover the codes used in design and the by-laws of the building. Typically there are no details on these drawings.

READ ALSO:   What is a moderate conservative?

What Ga drawing means?

General Arrangement Drawing
A GA Drawing stands for General Arrangement Drawing; it is used to communicate the important overall relationship between the main elements of the tank and key dimensions. This drawing acts as a gateway between the designer, in this case, Fuelchief and the customer.

What is the difference between IFC and AFC drawings?

A Construction team must use only an AFC marked or stamped drawings and documents for the construction works and activities. Issued for Construction (IFC) means that the document or drawing which are categorised as the review, and Issued for Construction.

What is MEP stand for?

mechanical, electrical and plumbing
In the construction world, MEP stands for “mechanical, electrical and plumbing.” MEP engineering is the science and art of planning, designing and managing the MEP systems of a building.

What is an assembly and subassembly drawings?

An assembly drawing shows how each part of a design is put together. If the design depicted is only part of the total assembly, it is referred to as a subassembly. Assembly may consist both of individual original & standard components and of subassemblies of the 1st level.

READ ALSO:   What is the order of filtration?

What is AFC documentation?

C. Document Review and Approval Definitions. Approved for Constriction (AFC) means that the document or drawing was reviewed and approved by authorities of internal and external organisations including the client representatives for the construction.