How many metro stations are there in Lucknow?

How many metro stations are there in Lucknow?

21 metro stations
As of now, Lucknow Metro has 21 metro stations with a total route length of 22.878 km (14.216 mi).

Is there any metro in Lucknow?

Lucknow Metro is a rapid transit system serving the city of Lucknow in the Indian state of Uttar Pradesh. It is the eighth longest operational metro network in India after the Delhi Metro, Hyderabad Metro, Chennai Metro, Namma Metro, Kolkata Metro, Noida Metro and Kochi Metro.

Is Lucknow airport metro running today?

Lucknow Metro train operate from 06.00 AM to 10.00 PM.

How can I get metro card in Lucknow?

READ ALSO:   How long does it take to download 100GB?

GoSmart card can be purchased from the Ticket Office Machine and Excess Fare Office of Lucknow Metro stations.

Is Lucknow metro open on Sunday?

The metro will operate normally from 7 am, and the last train will depart at 7 pm from both terminals, the officials said. This comes as Uttar Pradesh had lifted COVID-imposed lockdown restrictions in all districts except Meerut, Saharanpur, and Gorakhpur, on Sunday.

How much time does it take for Lucknow metro?

Travel time to the last station of the line takes 40 minutes and getting to city centre takes approximately 20 minutes depending on the exact stop.

What is the Lucknow Metro system?

The Lucknow Metro system is an urban Mass Rapid Transit System (MRTS) being built to serve the capital of Uttar Pradesh. Phase 1 of the project consists of 2 lines totaling 33.976 km. Out of this, 9.99 km will be built underground in the heart of the city.

READ ALSO:   Does current flow through a diode in reverse biased?

When was the Lucknow elevated railway line built?

Construction for the 8.5 km elevated ‘priority’ section from Transport Nagar to Lucknow Railway station (Charbagh) of the north-south line began on September 27 2014. Trial runs (testing) started in December 2016 and the line was inaugurated on September 5 2017 with commercial operations starting the next day.

When will the Lucknow LINE-1 be completed?

Construction for Line-1’s 8.5 km elevated ‘Priority Corridor’ section from Transport Nagar to Lucknow Railway Station (Charbagh) commenced on September 27, 2014. Trial runs (testing) started in December 2016 and the line was inaugurated on September 5, 2017 with commercial operations starting the next day.

Who handed over the keys to the Lucknow Metro trial run?

The trial run of the Lucknow Metro has been flagged-off by Chief Minister Akhilesh Yadav with the presence of his father and Samajwadi party supremo Mulayam Singh Yadav on 1 December 2016. The entire Samajwadi Party was present at the function. Two female drivers were handed-over the keys by the Chief Minister’s wife Dimple.